skip to main content
Student Affairs  /  Campus Announcements  /  Portion of San Pasqual Walk Closed to Traffic Through August 29

Portion of San Pasqual Walk Closed to Traffic Through August 29

August 22, 2018

UTILITY & SERVICE INTERRUPTION NOTICE

** This Interruption has been extended until Wed. 8/29/18**

Building/s affected: San Pasqual Walk & Fire Lane at the Eastern end of Church

Utility or service being interrupted: Pedestrian & Vehicle Traffic

Date & Time of interruption: Mon. 8/20/18 at 7 a.m. until Wed. 8/29/18 at 4 p.m.

Potential impact: San Pasqual Walk at the Eastern end of Church will be closed to all traffic due to the installation of a new fire hydrant and backflow

Special Instructions: Construction fencing will be in place, Pedestrian traffic will be routed around the site and all vehicle traffic will have access via California Blvd. Please see the attached map.


Contact: Brad Nielsen Ext. 8751 or Ben Smith Ext. 4190

If there is a problem with this Interruption, please notify
the Service Center X-4717 or the above Contact as soon as possible.
If no response is received we will proceed with the interruption.